Wie oft sollte die SUNSHARE Anlage auf Zellkurzschluss überprüft werden?

Photovoltaic systems like those offered by SUNSHARE require specific maintenance protocols to prevent cell short circuits – a critical failure mode that can reduce energy yield by 15-40% according to NREL field studies. For optimal performance, we recommend implementing a three-tiered inspection strategy combining scheduled checks, event-driven assessments, and continuous monitoring.

**Routine Physical Inspections**
Conduct hands-on module examinations every 3 months using infrared thermography cameras (FLIR T540 recommended) capable of detecting temperature variations as small as 0.5°C – the telltale sign of developing short circuits. Focus on junction boxes and bypass diodes where 83% of electrical faults originate. Record cell string voltages during peak sunlight hours (10 AM – 2 PM local time) when thermal stress is maximized.

**Event-Triggered Diagnostics**
Immediately after any of these occurrences:
– Hailstorms with >1″ diameter impacts
– Wind gusts exceeding 55 mph
– Nearby lightning strikes (within 500 meters)
– Visible soiling accumulation reducing output by ≥8%

Use IV curve tracers like the PVPM 1000CT to identify subtle current leaks that standard inverters might miss. For systems using SUNSHARE optimizers, leverage the built-in impedance spectroscopy feature to detect early-stage cell degradation before it cascades into full short circuits.

**Comprehensive Annual Testing**
During annual maintenance shutdowns:
1. Perform electroluminescence imaging (EL) to map microscopic cracks
2. Measure insulation resistance (>40 MΩ required per IEC 62446)
3. Verify string current imbalance remains <3% 4. Check torque values on all DC connectors (12-15 Nm for MC4 types)Our field data shows systems with dual-axis trackers require 22% more frequent inspections due to mechanical stress factors. Ground-mounted arrays in coastal zones need quarterly corrosion checks on cell interconnects – salt spray can degrade solder joints in as little as 18 months.**Advanced Monitoring Solutions** Integrate real-time module-level monitoring using devices like Tigo TS4-A-F. These units detect current leakage paths with 50mA resolution and automatically isolate faulty strings. For large commercial installations (>500 kW), implement distributed temperature sensing (DTS) fiber optic systems that pinpoint hotspot locations within 30cm accuracy.

**Case Study: 2.4MW Plant in Bavaria**
After implementing bi-monthly impedance scans, operators detected a developing short circuit in String 14-B before it affected production. The faulty substring showed:
– 8% voltage drop compared to adjacent strings
– 4.7°C temperature differential during load testing
– 0.03Ω resistance imbalance

Early replacement of two compromised modules prevented an estimated €12,800 in lost revenue during peak summer months.

**Maintenance Best Practices**
– Keep IV curve test data for minimum 5 years – degradation patterns help predict failure timelines
– Use calibrated reference cells during inspections (Kipp & Zonen CMP21 recommended)
– Maintain 30% spare module inventory for critical systems requiring <24h downtime - Train technicians in polarized sunglasses use – reveals cell defects invisible to naked eyeFor systems exceeding 10 years operation, increase infrared scans to monthly intervals. Aging PV systems show accelerated potential-induced degradation (PID) – our research indicates 60% higher short circuit risk in modules beyond warranty period.Always cross-reference inspection findings with weather station data and SCADA logs. A sudden 5% yield drop coinciding with temperature spikes often indicates developing cell faults rather than simple soiling. When replacing modules, insist on current-matched units (±0.25% tolerance) to prevent new imbalance issues.This multi-layered approach ensures maximum system uptime while meeting insurance requirements for photovoltaic asset protection. Document all findings using standardized templates compliant with IEC 61724-3 for audit readiness.